Lidio Ramón Pérez Thermoelectric Plant
The Lidio Ramón Pérez Thermoelectric Plant is integral to Cuba's power grid, amid ongoing crises and outages. It highlights repair efforts and national grid challenges.
Felton Unit Reconnects to National Grid, But Energy Crisis Lingers
Published on 3/2/2025
Repairs Begin at Felton Amid Escalating Energy Crisis in Cuba
Published on 2/18/2025
Thermoelectric Plant Felton Rejoins National Electric Grid
Published on 2/8/2025
Power Supply Failure Causes Shutdown at Guiteras Plant: Synchronization Expected Soon
Published on 2/2/2025
Cuba Struggles with Persistent Power Outages Amid Energy Crisis
Published on 12/6/2024
Cuban Government Claims National Power Grid is Back Online
Published on 11/8/2024
Tropical Storm Oscar Disrupts Electrical Microgrids in Holguín
Published on 10/21/2024
National Power Grid on the Brink: From 22,000 Tubes to Hundreds of Millions of Screws and Bolts
Published on 9/24/2024
Cuban Woman Gives a Unique Twist to The Little Mermaid: "On This Island Surrounded by Water, You Can't Even Find Salt"
Published on 6/6/2024
Energy Minister on Cuba's Blackouts: "They Are Bearable"
Published on 5/21/2024